Electricians continued the second-floor wall and ceiling rough-in. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK framers continued install of the drywall on the first-floor ceilings and continued framing on the second floor. CK carpenters continued window trim installation, door casing install, and continued layout of historic newel posts. Painters continued priming and first coat of the existing ground floor ceilings. Elevator technicians continued the elevator install. The flooring crew began subfloor prep of the second floor.