The first phase of the topper concrete has been poured in the attic successfully. Prior to the pour, elevation measurements were taken throughout as well as temporary shoring underneath just to be sure nothing moved or shifted as that weight was reintroduced to the structure. This is a completely different look and condition to the attic floor from the original attic material. Most of this area will hold HVAC equipment as we progress.

Ben Carpenter, Perry County Commissioner
Originally posted to Facebook