A masonry knee wall was completed in attic, and masons have begun removing existing joints on stone belt on east elevation. These joints are to be repointed when the weather improves. Onsite walkthroughs with potential contractors are ongoing, and an onsite meeting with CK, the county, and Spectrum representatives was conducted to discuss fiber relocation in the west alleyway.