Electricians continued second floor wall and ceiling rough-in and installed can lights on the first floor. The HVAC crew continued ductwork and refrigeration lines in the attic. Exterior plumbers installed the Northeast storm lines. CK framers continued installing framing and drywall on the second floor. CK carpenters continued door casing on the first and second floor. Painters continued priming on all floors and first coat on windows and door casings. Elevator technicians continued the elevator install. The flooring crew continued floor fill on the ground floor and ceramic tiling in the first-floor restrooms. Roofers installed chimney caps and set lower roof finials.