
In the last post, I highlighted how we are recessing electrical paths along the walls. Another electrical challenge we have is going through walls. To go through any wall in our Courthouse is an 18″ bore through solid stone or brick. The electrical design and work is not an impulse installation. These bores and cuts receive major consideration, and were planned for every light and every plug a year before construction started.
– Ben Carpenter, Perry County Commissioner
Originally posted to Facebook