Perry County, Ohio
  • Services
    • 911
    • Auditor
    • Board of Developmental Disabilities
    • Board of Elections
    • Bureau of Motor Vehicles
    • Children Services
    • Commissioners
    • Coroner
    • District Library
    • Dog Shelter
    • Emergency Management
    • Engineer
    • Fairview Assisted Living
    • Health Department
    • Job & Family Services
    • Land Bank
    • Mobility Management
    • OSU Extension Office
    • Park District
    • Retired Senior Volunteer Program
    • Senior Center
    • Soil & Water Conservation
    • Tourism
    • Transit
    • Treasurer
    • Veterans Services Commission
    • Waste Reduction & Recycling
    • Water & Wastewater
  • Records
    • Public Notices
    • Clerk of Courts
    • Recorder
    • Title Office
  • Law & Courts
    • Common Pleas
    • Municipal Court
    • Probate & Juvenile
    • Multi-County Juvenile Facility
    • Prosecutor
    • Sheriff’s Office
  • People
    • Directory
    • Job Opportunities
    • Human Resources
  • Events

Home About News Contact

Perry County

Perry County Courthouse Renovation

I want to...
  • Pay My Water Bill
  • Purchase / Renew a Dog License
  • Get / Renew a Driver’s License
  • Contact Children Services
  • Contact My Commissioners
  • Report a Crime
I need a record...
  • Vehicle, Boat Titles
  • Tax Records
  • Property Records
  • Court Records
  • Crime Incident Records
I need assistance...
  • Public Safety Issue
  • Child Safety Situation
  • Elderly Safety Situation
  • Food or Housing
  • Substance or Addiction Issues
  • Agricultural Issues
  • Tax Issues
Perry County Courthouse Weekly Summary | December 20, 2024

December 20, 2024 | Perry County Courthouse Weekly Summary

Electricians continued excavation for the permanent power on the ground floor. CK carpenters and framers have continued wood restoration of existing doors and frames, soffit framing, and drywall installation. CK carpenters continued restoration of the existing wood door and frames. The second floor’s SOMD install is ongoing. Exterior masons finished tuckpointing on the West elevation and continued masonry restoration on the South elevation. Interior masons began the install of the first-floor arch stabilization steel. Painters have continued to prime and first coat the first floor of the building.

Download PDF

Perry County Courthouse Weekly Summary | December 13, 2024

December 13, 2024 | Perry County Courthouse Weekly Summary

Electricians continued excavation for the permanent power on the ground floor. CK carpenters and framers have continued wood restoration of existing doors and frames, soffit framing, and drywall installation. CK carpenters continued restoration of the existing wood door and frames. The second floor’s SOMD install is ongoing. Exterior masons have grouted Northwest brick knee wall in the attic while interior masons finished parge coating on the second floor. Painters have continued to prime and first coat the first floor of the building.

Download PDF

Perry County Courthouse Weekly Summary | December 6, 2024

December 6, 2024 | Perry County Courthouse Weekly Summary

Electricians began excavation for the permanent power on the ground floor, with exterior electricians continuing to install lightning protection. The HVAC crew has continued running duct and refrigerant piping on the ground and first floor. CK carpenters and framers have continued wood restoration, framing and drywall installation. The steel crew has continued SOMD and arch steel installation on the second floor. Exterior masons rebuilt the Northwest brick knee wall in the attic, while interior masons finished parge coating on the first floor and began on the second floor. Painters have continued to prime and first coat the first floor of the building.

Download PDF

Perry County Courthouse Weekly Summary | November 27, 2024

November 27, 2024 | Perry County Courthouse Weekly Summary

The HVAC crew continued running duct and refrigerant piping on the ground and first floor. CK carpenters and framers have continued wood restoration, framing and drywall installation. The steel crew has continued SOMD and arch steel installation on the second floor. Exterior masons continued tuckpointing on the south elevation. Roofers have finished the roof tile install- work on the copper flashing is ongoing.

Download PDF

Perry County Courthouse Weekly Summary | November 22, 2024

November 22, 2024 | Perry County Courthouse Weekly Summary

All work from the previous weeks remains ongoing. This includes electrical roughing-in on the ground, first, and second floor and the installation of lighting protection system. The HVAC crew has also continued running ducts and began installing insulation on the ground, first, and second floor.

Download PDF

Perry County Courthouse Weekly Summary | November 8, 2024

November 8, 2024 | Perry County Courthouse Weekly Summary

The CK steel crew has finished the SOMD install on the second floor and began installing steel for the egress stair. The concrete crew has completed SOMD prep in the attic. Exterior masons have returned to tuckpointing on the North and East elevations while interior masons began parge coating on the first floor.

Download PDF

Perry County Courthouse Weekly Summary | November 1, 2024

November 1, 2024 | Perry County Courthouse Weekly Summary

The CK steel crew has begun SOMD install on the second floor. Exterior mason finished West elevation restoration, and began work on the South side. Interior masons have completed the HVAC lintel install on first floor and installed egress stair bearing plates. Plumbers have begun installations of the first and second floor plumbing
insulation.

Download PDF

Perry County Courthouse Weekly Summary | October 25, 2024

October 25, 2024 | Perry County Courthouse Weekly Summary

Electricians have continued roughing-in walls on the ground, first, and second floor and begun installation of lighting protection system. Exterior masons finished clock tower restoration work, reset the North gable cap stones, and continued restoration on the West and North elevations of the building. Interior masons continued HVAC lintel install and grouted the magistrate court pinch beam.

Download PDF

Perry County Courthouse Weekly Summary | October 18, 2024

October 18, 2024 | Perry County Courthouse Weekly Summary

CK’s steel crew has installed the remaining support steel in the magistrate courtroom on the first floor and continued steel decking in the attic. Plaster restoration continues on the second floor, and the plaster crew began cutting conduit channels on the second floor. Exterior masons have continued restoration work on the West and North elevation of the building. Interior masons continued the HVAC lintel install and finished the bearing plate install for the new egress stair. The demo crew has removed a wall in the magistrate courtroom and finished demo for the new egress stair.

Download PDF

Perry County Courthouse Weekly Summary | October 11, 2024

October 11, 2024 | Perry County Courthouse Weekly Summary

CK’s carpenters installed base on the first floor, while their steel crew installed support steel in the magistrate courtroom on the first floor and continued steel decking in the attic. The scaffolding crew removed clock tower scaffolding support beams. The plaster crew has continued plaster restoration on the second floor and began cutting conduit channels on ground floor. Exterior masons began masonry work on the West elevation of the building, while interior masons began installation of the HVAC lintel. Plumbing installation rough in has now moved to the first and second floors.

Download PDF

Perry County Courthouse Weekly Summary | October 4, 2024

October 4, 2024 | Perry County Courthouse Weekly Summary

The HVAC crew has continued piping and duct work install on the ground and first floors. CK framers hung drywall on the first and second floors and began working on the elevator lid. The CK steel crew finished installation of the pinch beam in first-floor magistrate court and began steel decking in the attic floor arches. Painters have continued the first coat throughout the second floor. Exterior masons patched clock tower scaffolding imbeds and began north gable brick relay. Plumbing installation of the first and ground floors continues.

Download PDF

Perry County Courthouse Weekly Summary | September 27, 2024

September 27, 2024 | Perry County Courthouse Weekly Summary

The HVAC crew have moved on to refrigerant piping installation, while interior masons and CK’s steel crew began work on the pinch beam in the first-floor magistrate court. Exterior masons have re-installed the clock face frames and finished tuckpointing on the clock tower. The demo crew removed brick arches, and a wall on the second floor. Plumbing installation of the first and ground floors continues.

Download PDF

Perry County Courthouse Weekly Summary | September 20, 2024

September 20, 2024 | Perry County Courthouse Weekly Summary

The HVAC crew installed above ceiling units and continued duct layout. The CK steel crew has begun the lateral steel install on the second floor. The plaster crew finished creating the eagle medallion mold for the first-floor corridor. Priming is now complete- painters began their first coat in the second-floor courtroom. Reassembly of clock tower clock faces has begun, and the elevator shaft erection is complete. Roofers finished roof tile and copper gutter installation on the clock tower, with TPO roof in the bell tower expected to finish early next week. Plumbing installation of the first and ground floors continues.

Download PDF

Perry County Courthouse Weekly Summary | September 13, 2024

September 13, 2024 | Perry County Courthouse Weekly Summary

CK’s steel crew began lateral steel install on the second floor, while the exterior masons finished disassembly of clock tower clock faces. Demolition of the 2nd floor ceiling jack arch has begun. The plumbing ground floor rough in remains ongoing, but installation of first floor in-wall plumbing has begun.

Download PDF

Perry County Courthouse Weekly Summary | September 6, 2024

September 6, 2024 | Perry County Courthouse Weekly Summary

Electricians have continued roughing in walls on the ground, first, and second floors. Wood restoration and wood base priming remain ongoing. CK’s steel crew finished the Southwest roof steel install. The plaster crew has created plaster molds on the first floor and began installing plaster base on the ground floor. Interior masons continued elevator shaft erection. Roofers began roof tile and TPO roofing install on the clock tower roof. Demolition for the egress stair and elevator floor is now complete, and the plumbers have begun the ground floor in wall rough in.

Download PDF

Perry County Courthouse Weekly Summary | August 30, 2024

August 30, 2024 | Perry County Courthouse Weekly Summary

CK carpenters have continued wood restoration on the second floor, with the steel crew installing lateral bracing. Plaster patching and wood base priming remain ongoing. Exterior masons began disassembly of clock tower clock faces. Roofers finished installation of roof sheathing and began work on the copper gutter. The demo crew returned and began floor demo for the elevator and egress stair.

Download PDF

Perry County Courthouse Weekly Summary | August 23, 2024

August 23, 2024 | Perry County Courthouse Weekly Summary

CK carpenters have continued wood restoration on the first floor and installed blocking on the ground floor while the steel crew finished install of structural steel on the clock tower roof. Plaster patching and wood base priming remain ongoing. Exterior masons have now finished washing the clock tower masonry, and interior masons have installed the remaining doorway lintels. Roofers installed roof sheathing and membrane on
the clock tower.

Download PDF

Perry County Courthouse Weekly Summary | August 16, 2024

August 16, 2024 | Perry County Courthouse Weekly Summary

CK carpenters have continued wood restoration and installed blocking on the ground floor. The plaster crew has moved on to patching on the ground floor. Painters have started priming existing wood throughout the courthouse. Tuckpointing the clock tower masonry is complete. The demo crew cut remaining walkway openings and has begun brick arch demo for the new egress stair and elevator.

Download PDF

Perry County Courthouse Weekly Summary | August 9, 2024

August 9, 2024 | Perry County Courthouse Weekly Summary

While layout work is still ongoing, HVAC installers began hanging ducting in the attic. CK carpenters continued door and frame restoration on the first floor. CK framers continued installing stud framing on the ground and 1st floor, and the steel crew has installed structural steel on the clock tower roof. Plaster patching on the first floor, lintel installation on the ground and first floor, and clock tower tuckpointing has continued. The demo crew has cut new openings on the ground floor.

Download PDF

Perry County Courthouse Weekly Summary | August 1, 2024

August 1, 2024 | Perry County Courthouse Weekly Summary

Scaffolders continued installing shoring throughout the courthouse floors. Electricians have started roughing in the interior walls, while HVAC continues layout work on first and second floors. Door and wood restoration on the first floor has begun, and carpenters continued installing stud framing in the ground floor rooms. The plaster crew continued work in the second floor courtroom and has begun patching on the first floor. Interior masons continued lintel installation on the first and ground floors, while exterior masons finished relaying the West gable stones and continued grinding and tuckpointing the clock tower. The concrete crew poured the ground floor courtroom.

Download PDF

Perry County Courthouse Weekly Summary | July 26, 2024

July 26, 2024 | Perry County Courthouse Weekly Summary

Interior masons continued lintel installation on the second floor, while exterior masons pulled the North gable, West gable, and Southwest corner. The concrete crew poured ground floor rooms. Carpenters continued sanding doors and began framing in the ground floor rooms. HVAC layout work on first and second floor and electrical layout work on the first and ground floor continues, along with plaster restoration in the second-floor courtroom. Painters started mock-up work on the first floor.

Download PDF

Perry County Courthouse Weekly Summary | July 19, 2024

July 19, 2024 | Perry County Courthouse Weekly Summary

Roofers finished the Northeast and Southeast towers, with copper finials to be installed at a later date. Interior masons continued lintel installation on the ground and second floors, while exterior masons relayed the South and East gables and continued grinding joints around the clocktower. The concrete crew poured elevator shaft wall and continued prep for concrete slab pour. Carpenters have continued sanding on the first floor. The plaster crew is now restoring plaster in second floor courtroom. HVAC layout work on first and second floor and electrical layout work on the ground floor are still ongoing.

Download PDF

Perry County Courthouse Weekly Summary | July 12, 2024

July 12, 2024 | Perry County Courthouse Weekly Summary

Roofers continued working on the ridge caps on the Northeast and Southeast towers. Exterior masons relayed the South gable. The concrete crew has completed the elevator footer pour and started geofoam installation on ground floor and prepping rebar and elevator shaft wall pour. The plaster crew began removing existing plaster in second floor courtroom. HVAC layout work on the second floor has begun. Lintel installation on second floor and electrical layout work are still ongoing.

Download PDF

Perry County Courthouse Weekly Summary | July 3, 2024

July 3, 2024 | Perry County Courthouse Weekly Summary

Roofers finished painting the clock tower roofing structure and began ridge installation on the Northeast tower as well as box gutters on east and west sides of the courthouse. Masons continued lintel installation on the ground floor and tuckpointing the clocktower. The concrete crew completed the underground tunnel pour and spread footer pour in the ground floor courtroom- preparations for the elevator footer pour have begun. Carpenters continued sanding on the first floor. Electricians began layout work for the courthouse.

Download PDF

Perry County Courthouse Weekly Summary | June 28, 2024

June 28, 2024 | Perry County Courthouse Weekly Summary

Roofers finished tile installation on the Southeast tower and have continued work on clock tower roofing structure. Interior masons finished the lintel installation on the ground floor openings and have moved on to the second floor. Work on the gables and tuckpointing the clocktower continues. The concrete crew began foam prep installation and prep for the underground tunnel pour. The carpenters have finished sanding the second floor courtroom and began work on the first floor.

Download PDF

Perry County Courthouse Weekly Summary | June 21, 2024

June 21, 2024 | Perry County Courthouse Weekly Summary

Scaffolding erectors installed clock tower turret scaffolding and tore down scaffolding inside the historic stairway. Tile installation on the Northeast tower is complete; the roofers have moved on to the Southeast tower. Lintel installation on the ground floor and work on the gables is ongoing. The masons have also begun tuckpointing the clocktower. The concrete crew finishing excavation work for the courthouse’s new elevator pit and egress stair footings. Carpenters began sanding the second floor courtroom in preparation of faux painting.

Download PDF

Perry County Courthouse Weekly Summary | June 14, 2024

June 14, 2024 | Perry County Courthouse Weekly Summary

Scaffolding erectors have installed interior clock tower scaffolding and torn down scaffolding around the tower chimneys. Installation of the clock tower roof, as well as tile installation on the towers has begun. Gutter installation on the North and East side of courthouse is still ongoing. Interior masons have started lintel installation on openings in the ground floor, while exterior masons finished the chimney restoration and continued work on the gables. The concrete crew also continued prep work on the ground floor for the new footer installation.

Download PDF

Perry County Courthouse Weekly Summary | June 7, 2024

June 7, 2024 | Perry County Courthouse Weekly Summary

Box gutter installation on Southeast tower has begun as roofers also continue the removal of the gutters on the East side of courthouse. Installation of new gutters is expected to continue into next week, along with the laying of new roofing on the clock tower. The Masons have finished tuckpointing and began stone consolidation on chimneys. Their work on the chimneys is expected to finish next week, with restoration of the gables to follow. The demo crew has completed the removal of the existing elevator shaft and cleaned throughout the courthouse. The concrete crew has also removed portions of concrete slab on ground floor to prep for installation of new footers for the foundation.

Download PDF

Perry County Courthouse Weekly Summary | May 31, 2024

May 31, 2024 | Perry County Courthouse Weekly Summary

Scaffolding erectors modified historic stairway scaffolding to accommodate the elevator shaft demo. Roofers have started install box gutters on Northeast tower, while the masons continued tuckpointing around the Southeast and West chimneys. The demo crew has completed removing the first floor plaster ceilings and continued work on the elevator shaft. Plumbers have completed the underground plumbing on the ground floor. A structural engineer and May’s Consulting were onsite to review the clocktower structural member conditions throughout the week.

Download PDF

Perry County Courthouse Weekly Summary | May 24, 2024

May 24, 2024 | Perry County Courthouse Weekly Summary

Scaffolding was installed in the main staircase to allow for the demolition of the elevator shaft and 2nd floor plaster ceiling. The demo crew also removed the existing attic staircase Roofers have continued box gutter work on the second tower while the masons removed east gable cap stones- once the underlying brick is restored, the cap stones will be reattached. Masons also continued tuckpointing and chimney restoration. The underground plumbing rough-in on the ground floor is ongoing.

Download PDF

Perry County Courthouse Weekly Summary | May 17, 2024

May 17, 2024 | Perry County Courthouse Weekly Summary

Scaffolding erectors completed work on all elevations of the courthouse. Roofers began roof sheathing on clock tower and continued box gutter work on the East towers. Mortar and stone patching around the building and masonry work on the chimneys continues, along with the removal of the existing elevator and plaster ceilings throughout the courthouse. Plumbers began installation of sanitary lines within the ground floor tunnel, with plans to continue ground floor plumbing next week.

Download PDF

Perry County Courthouse Weekly Summary | May 10, 2024

May 10, 2024 | Perry County Courthouse Weekly Summary

Scaffolding erectors completed work on bell tower scaffolding. Mortar and stone patching around the building and masonry work on the chimneys continues. The demo crew completed removing the ground floor’s tunnel caps and mechanicals within the tunnel and began removal of the existing elevator and plaster ceilings throughout the courthouse.

Download PDF

Perry County Courthouse Weekly Summary | May 3, 2024

May 3, 2024 | Perry County Courthouse Weekly Summary

Roofers completed removal and installation of new roof sheathing on the East towers. Scaffolding erecters continued work on chimney and bell tower scaffolding. Masons continued mortar and stone patching around the building. CK iron workers continued work on new steel in the North-West corner of the attic.

Download PDF

Perry County Courthouse Weekly Summary | April 26, 2024

April 26, 2024 | Perry County Courthouse Weekly Summary

Roofers completed removal and installation of new roof sheathing on the East towers. Scaffolding erecters continued work on chimney and bell tower scaffolding. Masons continued mortar and stone patching around the building. CK iron workers continued work on new steel in the North-West corner of the attic.

Download PDF

Perry County Courthouse Weekly Summary | April 19, 2024

April 19, 2024 | Perry County Courthouse Weekly Summary

Roofers completed removal and installation of new roof sheathing on the main portion of the roof this week. Roofers began and will continue to install new roof sheathing on the East towers next week. Scaffolding erectors utilized a crane to install beams through bell tower windows to begin tower scaffolding. Masons continued mortar and stone patching around the building. CK laborers removed existing millwork on the
1st and 2nd floor.

Download PDF

Perry County Courthouse Weekly Summary | April 12, 2024

April 12, 2024 | Perry County Courthouse Weekly Summary

Roofers continued removal and installation of new roof sheathing on the West elevation of the roof. CK laborers grouted attic steel and performed general site cleanup. CK project team walked with the design team to review plans for courthouse main entryway. Scaffolding subcontractors began erection of the bridge connecting to the bell tower as well as interior bell tower scaffolding.

Download PDF

Perry County Courthouse Weekly Summary | April 5, 2024

April 5, 2024 | Perry County Courthouse Weekly Summary

Roofers continued removal and installation of new roof sheathing on the East elevation of the roof. Grout materials have arrived to the jobsite for use in setting new attic steel. CK laborers demoed the existing sloped roof over the second-floor skylight and existing shelving in the attic. CK iron workers continued layout and miscellaneous demolition for the upcoming steel install in the attic. The CK project team walked with county judges, bailiffs, and clerks occupying the second-floor spaces to review the AV and technology packages.

Download PDF

Perry County Courthouse Weekly Summary | March 29, 2024

March 29, 2024 | Perry County Courthouse Weekly Summary

Masons have completed the majority of stone washing, with plans to provide touch up after scaffold removal. They also reviewed mortar and patching mockups on-site with Mays Consulting. Roofers began existing roof demo with new sheathing install with work to continue next week. CK, SCA, Perry County, and our painting contractor reviewed interior finishes on-site.

Download PDF

Perry County Courthouse Weekly Summary | March 22, 2024

March 22, 2024 | Perry County Courthouse Weekly Summary

Masons have completed the majority of stone washing, with plans to provide touch up after scaffold removal. They also reviewed mortar and patching mockups on-site with Mays Consulting. Roofers began existing roof demo with new sheathing install with work to continue next week. CK, SCA, Perry County, and our painting contractor reviewed interior finishes on-site.

Download PDF

Perry County Courthouse Weekly Summary | March 15, 2024

March 15, 2024 | Perry County Courthouse Weekly Summary

Masons completed the North elevation stone cleaning, with the East elevation to be complete next week, and continued patching exterior masonry along the South elevation. Initial roofing materials have been delivered to the jobsite in preparation for roofers to start demolition early next week. CK iron workers will also be onsite next week to unload attic steel.

Download PDF

Perry County Courthouse Weekly Summary | March 8, 2024

March 8, 2024 | Perry County Courthouse Weekly Summary

Masons completed the South elevation stone cleaning, with plans to start on the West elevation cleaning next week. They also created stone patching samples to ensure accurate color comparisons. Our window supplier and installer field measured all openings on 3/7. Trash chutes were installed on the North and south elevations, with roofing to commence imminently.

Download PDF

Perry County Courthouse Weekly Summary | March 1, 2024

March 1, 2024 | Perry County Courthouse Weekly Summary

Masons have continued work on stone patching prep, stone patching samples, and stone cleaning samples. Our window supplier is scheduled to be onsite next week to field measure openings. Our roofing contractor is also scheduled to meet onsite next week for a preconstruction meeting, with mobilization expected late next week. Our scaffolding contractor to be onsite next week to install trash chutes for roof demo. CK, our design team, and potential MEP subcontractors met onsite on 2/27 to review scope packages.

Download PDF

Perry County Courthouse Weekly Summary | February 23, 2024

February 23, 2024 | Perry County Courthouse Weekly Summary

Masons continued work in the attic with focus now on the South knee wall and started removing mortar joints on the West and South building elevations. They have also continued developing field mockups for a mortar color comparison. CK is currently working with our window supplier and installer on field measuring and shop drawings. CK, our design team, and potential MEP subcontractors will meet onsite next week to review scope packages. Onsite walkthroughs with potential subcontractors are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | February 16, 2024

February 16, 2024 | Perry County Courthouse Weekly Summary

Scaffolding on both the East and West sides of the courthouse is 100% complete and is green tagged for use, with tower scaffolding erection to follow after roof sheathing. CK iron workers completed installation of support steel on the north elevation of the attic with the remainder of the attic steel to be delivered onsite on 2/16. Ameritech removed the communication line from West side of building on 2/13. Onsite walkthroughs with potential subcontractors are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | February 9, 2024

February 9, 2024 | Perry County Courthouse Weekly Summary

Scaffolding on the South side of the building is 100% complete, with West side scaffolding to be completed by end of next week. CK iron workers completed the majority of the install of support steel on the North
Elevation of the attic. Spectrum also removed the overhead fiber line above the West side scaffolding on 2/6. Onsite walkthroughs with potential subcontractors are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | February 2, 2024

February 2, 2024 | Perry County Courthouse Weekly Summary

Scaffolding on the South side of the building remains at 80% complete – the scaffold crew will be back onsite the week of 2/5. The majority of the masonry wall along north elevation in the attic has been rebuilt, and CK iron workers started installation of steel on the North elevation of the attic. Onsite walkthroughs with potential subcontractors are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | January 26, 2024

January 26, 2024 | Perry County Courthouse Weekly Summary

A masonry knee wall was completed in attic, and masons have begun removing existing joints on stone belt on east elevation. These joints are to be repointed when the weather improves. Onsite walkthroughs with potential contractors are ongoing, and an onsite meeting with CK, the county, and Spectrum representatives was conducted to discuss fiber relocation in the west alleyway.

Download PDF

Perry County Courthouse Weekly Summary | January 19, 2024

January 19, 2024 | Perry County Courthouse Weekly Summary

Ludowici tile was delivered to the jobsite.

Download PDF

Perry County Courthouse Weekly Summary | January 12, 2024

January 12, 2024 | Perry County Courthouse Weekly Summary

Scaffolding on the south side of the building is now 80% complete. Masonry bricks were re-laid on North side of the attic. Masons also began repointing stone belt on the East elevation.

Download PDF

Perry County Courthouse Weekly Summary | January 5, 2024

January 5, 2024 | Perry County Courthouse Weekly Summary

Plywood sheathing over main courtroom ceiling is complete. Smaller newel posts were removed and are ready for replication. Temporary heaters were also installed on the Ground, 1st, and 2nd floors of the courthouse. Scaffolding on the south side of the building to be completed next week.

Download PDF

Perry County Courthouse Weekly Summary | December 28, 2023

December 28, 2023 | Perry County Courthouse Weekly Summary

Hat channel installation over the main courtroom ceiling is complete, with a structural inspection conducted on December 28, 2023. Plywood sheathing over main courtroom ceiling is ongoing. A large newel post was removed and is ready for replication. A propane tank has also been delivered to the jobsite, with heaters to be installed next week.

Download PDF

Perry County Courthouse Weekly Summary | December 22, 2023

December 22, 2023 | Perry County Courthouse Weekly Summary

East Elevation Scaffolding is 100% complete. A hat channel was installed over the courtroom ceiling, with plywood sheathing to start next week. O.K. Foundry has also shipped replicated samples including cast iron balusters and ornaments for the historical staircase to the jobsite.

Download PDF

Perry County Courthouse Weekly Summary | December 15, 2023

December 15, 2023 | Perry County Courthouse Weekly Summary

North Elevation scaffolding is now 100% complete, and scaffolding construction on the East and West Elevations has begun. Fencing was also reinstalled on the East side of the courthouse.

Download PDF

Perry County Courthouse Weekly Summary | December 8, 2023

December 8, 2023 | Perry County Courthouse Weekly Summary

North Elevation scaffolding is 80% complete, and Beta Max has been installed on the scaffolding. Another Prebid Phase 2 walkthrough with potential bidders was conducted Friday, December 8, 2023. Design meetings are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | December 1, 2023

December 1, 2023 | Perry County Courthouse Weekly Summary

Construction of scaffolding started Monday, November 27, 2023 on North Elevation. A prebid for Phase 2 began with a walkthrough on Thursday, November 30, 2023 with potential bidders. Portions of the courthouse’s historic stairs were also removed for future recreation in Phase 2. Design meetings are ongoing.

Download PDF

Perry County Courthouse Weekly Summary | November 10, 2023

November 10, 2023 | Perry County Courthouse Weekly Summary

Design Meetings continue. An Exterior Pull Plan Meeting took place on November 9, 2023 involving masonry, scaffolding, roofing, and steel construction. Exterior work is estimated to start on November 27, 2023.

Download PDF

Perry County Courthouse Weekly Summary | October 20, 2023

October 20, 2023 | Perry County Courthouse Weekly Summary

Phase 1 of construction is complete. Design Meetings are ongoing. A Future Building Envelope Meeting scheduled for October 23, 2025 will involve masons, scaffolding, foofing, and steel construction

Download PDF

Perry County Courthouse Weekly Summary | October 13, 2023

October 13, 2023 | Perry County Courthouse Weekly Summary

Final demolition cleanup, demolition of the ground floor ramp, and construction of raised wood flooring on the ground floor was completed.

Download PDF

Perry County Courthouse Weekly Summary | October 6, 2023

October 6, 2023 | Perry County Courthouse Weekly Summary

The removal of insulation in the attic was completed, along with demolition of the brick restroom wall all non-historic tiling, and construction of raised wood flooring on the ground floor has begun. Final cleanup of demolition is ongoing.

Download PDF

Perry County Courthouse Weekly Summary | September 29, 2023

Spetember 29, 2023 | Perry County Courthouse Weekly Summary

MEP demolition of the ground, first, and second floors was completed, as well as a general demolition cleanup for the attic. Removal of attic insulation is ongoing.

Download PDF

Perry County Courthouse Weekly Summary | September 22, 2023

September 22, 2023 | Perry County Courthouse Weekly Summary

Phase 1 of selective demolition of the ground, first, and second floors was completed, as well as a general demolition cleanup for all three floors.

Download PDF

Perry County Courthouse Weekly Summary | September 15, 2023

September 15, 2023 | Perry County Courthouse Weekly Summary

Selective demolition of the first and second floors continues. Temporary power and lighting was also installed in the courthouse and on-site trailer, and a walkthrough of the building’s clock tower was conducted.

Download PDF

Perry County Courthouse Weekly Summary | September 8, 2023

September 8, 2023 | Perry County Courthouse Weekly Summary

Selective demolition of the first and second floors continues. The building’s built-in furniture demolition is also ongoing.

Download PDF

Perry County Courthouse Weekly Summary | September 1, 2023

September 1, 2023 | Perry County Courthouse Weekly Summary

Selective demolition of the first and second floors continues. The building’s historic radiators were placed in storage, and a temporary power pole was set for the on-site trailer.

Download PDF

Perry County Courthouse Weekly Summary | August 25, 2023

August 25, 2023 | Perry County Courthouse Weekly Summary

Some built-in furniture and the building’s historic radiators were removed as wall protection continues to be installed. The courthouse’s front doors were also moved to the Opera House to await restoration. Demolition of the first and second floors continues.

Download PDF

Perry County Courthouse Weekly Summary | August 18, 2023

August 18, 2023 | Perry County Courthouse Weekly Summary

Cisterns were installed and construction site staging areas were completed. A temporary fence was also installed. Selective demolition at the courthouse is ongoing.

Download PDF

Perry County Courthouse Weekly Summary | August 11, 2023

August 11, 2023 | Perry County Courthouse Weekly Summary

Flooring protections were installed as floor inspections continued. All on-site furniture was also removed from the premises.

Download PDF

Perry County, Ohio
  • About
    • Villages, Townships & Communities
    • Discover Perry County
    • Perry County Photos
  • Records
    • Clerk of Courts
    • Recorder
    • Title Office
  • News
  • Events
  • Contact
  • Departments & Offices
    • 911
    • Auditor
    • Board of Developmental Disabilities
    • Board of Elections
    • Bureau of Motor Vehicles
    • Children Services
    • Commissioners
    • Coroner
    • Dog Shelter
    • Emergency Management
    • Engineer
    • Fairview Assisted Living
    • Health Department
    • Job & Family Services
    • Land Bank
    • Park District
    • Mobility Management
    • OSU Extension
    • Senior Center
    • Soil & Water Conservation
    • Tourism
    • Transit
    • Treasurer
    • Veterans Services Commission
    • Waste & Recycling
    • Water & Wastewater
  • Law & Courts
    • Common Pleas
    • Juvenile/Probate
    • Multi-County Juvenile Facility
    • Municipal
    • Prosecutor
    • Sheriff
  • People
    • Directory
    • Job Opportunities
    • Human Resources

Perry County Seal   Discover Perry County

212 S. Main Street, New Lexington, OH 43764 • (740) 342-2045

© Copyright 2025 Perry County, All Rights Reserved. Privacy Policy • Website Accessibility Statement • Site Map