Electricians continued second floor wall and ceiling rough-in and have set the generator. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK concrete installed formwork for the concrete sidewalk on the Southwest side of the building. CK framers continued installing framing and drywall on the second floor. CK carpenters continued door casing on the first and second floor. Painters finished priming the ground floor and are continuing to prime ceilings on the first and second floor. Elevator installation is ongoing. The flooring crew continued floor fill on the first floor and have begun ceramic tiling in the second-floor restroom.

Download PDF


Judge Tina Boyer of the Perry County Court of Common Pleas, General Division, was privileged to attend a reception for County elected officials at the Governor’s Mansion, with her son, Mason, on May 1, 2025. They enjoyed seeing the Governor, Mike DeWine, and the First Lady, Fran.


Electricians continued second floor wall and ceiling rough-in and poured the generator pad. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK framers continued installing the drywall on the first-floor ceilings and continued framing on the second floor. CK carpenters continued window trim installation, door casing install, and layout of historic newel posts. Painters continued priming and first coat of existing ground floor ceilings. Elevator technicians continued the elevator install. Flooring crew continued subfloor prep and floor fill on the second floor.

Download PDF


On Wednesday April 16, The Perry County Board of Commissioners presented a mobile AED (Automated External Defibrillator) unit to the Village of Crooksville. These units will be deployed with Crooksville Police Officers so they can reduce critical response time during a cardiac arrest. These AEDs are GPS-enabled and are a crucial tool that can beRead More…


Electricians continued the second-floor wall and ceiling rough-in. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK framers continued install of the drywall on the first-floor ceilings and continued framing on the second floor. CK carpenters continued window trim installation, door casing install, and continued layout of historic newel posts. Painters continued priming and first coat of the existing ground floor ceilings. Elevator technicians continued the elevator install. The flooring crew began subfloor prep of the second floor.

Download PDF


Change is Happening at the Perry County Board of Developmental Disabilities! We are pleased to announce the appointment of Caley Boyden, the agency’s current Finance Director, as our Transitional Assistant Superintendent (TAS). The rigorous interview process laid a foundation for the PCBDD Board of Directors to officially and confidently make the decision to appoint Caley.Read More…


New Lexington, Ohio – Judge Tina Boyer of the Perry County Court of Common Pleas, General Division, recently attended the Economic Institute for Judges, held in March 2025. The program was presented by the Law and Economics Center of George Mason University’s Antonin Scalia Law School. The Economic Institute for Judges is part of aRead More…


Electricians finished first floor above ceiling rough-in and continued the second floor rough-in. Low voltage electricians finished pulling wire on the first floor. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK framers began install of the drywall on the first floor ceilings and continued framing on the second floor. CK carpenters continued window trim installation, door casing install, and began layout of historic newel posts. Painters continued priming and first coat of existing ground floor ceilings. Elevator technicians continued elevator install. Interior masons parged the arches in the bell tower.

Download PDF


Electricians continued the first floor second floor rough-in and low voltage electricians continued pulling wire on the first floor. The HVAC crew continued ductwork on the first floor and refrigeration lines in the attic. CK framers continued ceilings on the ground and second floor, and framing walls around the elevator shaft. CK carpenters continued window trim installation and door refinishing. Painters continued priming and first coat of existing ground floor ceilings. Scaffolding erectors finished teardown of the exterior scaffold. Elevator technicians began elevator install. Interior masons installed a doorway lintel on the ground floor.

Download PDF


Electricians continued the first floor and panel rough-in while the HVAC crew continued ductwork on the first and refrigeration lines in the attic. CK framers continued shaft wall framing at the Egress stair, ceilings on the second floor, and framing wall around the elevator shaft. CK carpenters continued window trim installation and door refinishing. Window installers finished all elevation window installment. Painters continued their priming and first coat of existing ground floor courtroom ceiling. Scaffolding erectors continued teardown of the East elevation scaffolding. Replicated cast iron newel posts for the historic stair were delivered to the job site.

Download PDF